Preparation for sheet metal deburring and chamfering! Shengxingli mechanical deburring machine series

Source:Jinhua Shengxingli Machinery Manufacturing Co., Ltd.Release time:2024-07-17

Sheet metal chamfering is a common process in machining, its purpose is to remove the burr on the edge of the part and improve the smoothness and beauty of the part. The use of chamfering machine is of great significance to improve production efficiency and processing quality. This article will introduce the sheet metal chamfering test process in detail to ensure the normal operation of the equipment and the safety of production.

Before the sheet metal chamfering test machine, you need to make the following preparations:

1. Check the equipment: ensure that the chamfer is in good working condition, including whether the power supply, air pressure, lubrication and other systems are normal.

2. Prepare tools: Prepare the required tools and measuring tools, such as cutting tools, fixtures, measuring ruler, etc.

3. Clean up the site: Clean up the work area to ensure that there is no debris and garbage.

4. Understand drawings: familiar with sheet metal drawings, understand the size, shape and material of parts and other information.

Second, the test process

1. Start the device: Turn on the power supply and air pressure system to ensure the normal operation of the device.

2. Install abrasive: Select the appropriate abrasive according to the size and shape of the part, and install it on the knife holder of the chamfering machine.

3. Adjust parameters: According to the material and processing requirements of the parts, adjust the parameters of the equipment, such as feed speed, cutting depth, etc.

4. Test cutting: During the test cutting process, observe the cutting situation, check whether the tool is suitable and whether the equipment is running normally.

5. Measure the size: After the test cutting, use the measuring tool to measure the size of the parts and check whether it meets the requirements of the drawing.

6. Adjust parameters: Adjust the parameters of the equipment according to the measurement results to ensure the processing quality of the parts.

7. Repeat test machine: repeat the above steps until the processing quality of the parts meets the requirements.

Third, precautions

1. In the process of testing, always pay attention to safety to avoid accidents.

2. When adjusting parameters, adjust according to the actual situation, do not blindly pursue processing efficiency and ignore processing quality.

3. When measuring parts with a measuring tool, ensure the accuracy and reliability of the measuring tool.

4. In the process of grinding, it is necessary to keep the sharpness and stability of the abrasive to avoid breaking or sticking.

5. In the use of chamfer, regular maintenance and maintenance should be carried out to ensure the normal operation and service life of the equipment.

In short, the sheet metal chamfering test process is an important link to ensure the normal operation of equipment and production safety. In the process of testing the machine, it is necessary to make preparations carefully, strictly abide by the operating procedures, pay attention to safety matters and solve problems in time. Only in this way can we improve production efficiency and processing quality, reduce costs and ensure that the quality and safety of products meet the requirements.

主站蜘蛛池模板: 精品水蜜桃久久久久久久| 无码精品人妻一区二区三区av| 亚洲 日韩 激情 无码 中出| 亚洲综合色成在线播放| 精品国产一区二区三区av性色| 久久午夜夜伦鲁鲁片无码免费| 国产69精品久久久久99尤物| av淘宝国产在线观看| 国产欧洲亚洲日产一区| 久久久久国产精品人妻aⅴ四季| 人人爽久久涩噜噜噜丁香| 亚洲国产精品va在线看黑人| 亚洲性啪啪无码av天堂| 中文人妻av久久人妻水蜜桃| 啪啪激情婷婷久久婷婷色五月| 国产亚洲人成无码网在线观看| 最新欧美精品一区二区三区| 台湾无码av一区二区三区| 国产 日韩 另类 视频一区| 国产欧美一区二区三区精剧| 大香伊蕉在人线国产免费| 国产成 人 综合 亚洲奶水| 国产视频一区. 二区 在线| 国产一区二区三精品久久久| 精品高潮呻吟99av无码视频| 久久99精品久久只有精品| 久久久无码中文字幕久...| 久久天天躁狠狠躁夜夜爽| 欧美日韩精品一区电影| 欧洲人与动牲交α欧美精品| 青草青草久热精品视频国产4| 久久精品一区二区三区介绍| 国产精品妻一区二区三区无码| 国产欧洲亚洲日产一区| а√中文在线资源库| 亚洲国产精品无码久久98| 精品人妻少妇一区二区| 欧美人与动牲猛交xxxxbbbb| 色猫咪免费人成网站在线观看| 亚洲日本乱码在线观看| 2019最新国产不卡a|